SCHEDULE 3(Subsection 3(3) and section 4)Classes of Projects Within an Area Referred to in Schedule I of the Wildlife Area Regulations
PART 1Non-specific Classes
1 The operation, maintenance or repair of any physical work, including overhead or underground electrical transmission or distribution lines, whether or not the physical work is referred to in this Schedule
2 Any physical activity that is carried out entirely within the interior of a building
3 (1) The construction of any well used to conduct geotechnical, environmental or scientific investigations but not including any project that involves the placement of temporary or permanent fill in a water body
(2) The decommissioning of any well referred to in subsection (1)
PART 2Building Classes
Application
4 The classes of projects described in sections 6 to 9 do not include any project that involves
(a) the placement of temporary or permanent fill in a water body;
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures; or
(c) demolition that is to be carried out less than 30 m from a building.
5 This Part applies to any building located within an area referred to in Schedule I of the Wildlife Area Regulations.
Physical Works — Developed Land
6 On developed land, the construction, installation, decommissioning, removal, replacement, moving or demolition of any building that has a footprint of no more than 1000 m2
7 On developed land, the expansion of any building, provided that the total footprint of all expansions of that physical work is no more than 1000 m2
Physical Works — Land That Is Not Developed
8 (1) On land that is not developed, the construction or installation of any building that has a footprint of no more than 100 m2
(2) On land that is not developed, the expansion of any building, provided that the total footprint of all expansions of that physical work is no more than 100 m2
(3) On land that is not developed, the decommissioning, removal, replacement or moving of any physical work referred to in subsection (1), if the footprint is no more than 100 m2
9 The modification of any building
PART 3Other Physical Works
Interpretation and Application
10 In this Part, other physical work means
(a) a parking lot;
(b) a paved area; and
(c) a gravel or stone dust area.
11 The classes of projects described in sections 13 and 14 do not include any project that involves
(a) the placement of temporary or permanent fill in a water body; or
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures.
12 This Part applies to any other physical work.
Physical Works — Developed Land
13 On developed land, the decommissioning, removal or replacement of any other physical work that has a footprint of no more than 1000 m2
Physical Works — Land that is not Developed
14 On land that is not developed, the decommissioning, removal or replacement of any other physical work that has a footprint of no more than 100 m2
PART 4Utility Infrastructure
Application
15 (1) The classes of projects described in sections 17 to 19 do not include any project that involves
(a) the placement of temporary or permanent fill in a water body; or
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures.
(2) The classes of projects described in section 17 do not include any project that involves the use of
(a) vehicles or heavy machinery on the substrate of a water body; or
(b) explosives.
16 This Part applies to any water-related utility infrastructure, other than a water pipeline or water treatment facility, as well as any water pipeline.
Water-related Utility Infrastructure
17 The decommissioning, removal or replacement of any water-related utility infrastructure that has a footprint of no more than 1000 m2
Water Pipelines
18 The decommissioning, removal or replacement of any water pipeline that is no more than 1000 m in length
19 The decommissioning, removal or replacement of any water pipeline, of any length, that is located
(a) underneath a railway, a road or airport pavement;
(b) alongside and contiguous to the infrastructure referred to in paragraph (a), if on developed land; or
(c) within the right of way of a telecommunication or electrical line
PART 5Linear Infrastructures
Interpretation and Application
20 In this Part, linear infrastructure means
(a) a road; and
(b) a guardrail, handrail, curb, fence or gate.
21 The classes of projects described in sections 23 and 24 do not include any project that involves
(a) the placement of temporary or permanent fill in a water body; or
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures.
22 This Part applies to any linear infrastructure.
Linear Infrastructures
23 The decommissioning, removal or replacement of any linear infrastructure referred to in paragraph 20(a) that is no more than 100 m in length
24 (1) The construction or installation of any linear infrastructure referred to in paragraph 20(b) that is related to a building or other structure and that is no more than 100 m in length
(2) The lengthening of any linear infrastructure referred to in paragraph 20(b), if the lengthening is no more than 100 m in length
(3) The modification, decommissioning, removal or replacement of any linear infrastructure referred to in paragraph 20(b)
PART 6Mobility Projects
Application
25 The classes of projects described in sections 27 to 29 do not include any project that involves
(a) the placement of temporary or permanent fill in a water body; or
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures.
26 This part applies to any sidewalk, boardwalk, path or trail.
Mobility — Developed Land
27 (1) On developed land, the construction or installation of any sidewalk, boardwalk, path or trail that is related to a building or other structure and that has a footprint of no more than 1000 m2
(2) On developed land, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 1000 m2
(3) On developed land, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 1000 m2
Mobility — Land That Is Not Developed
28 (1) On land that is not developed, the construction or installation of any sidewalk, boardwalk, path or trail that is related to a building or other structure and that has a footprint of no more than 100 m2
(2) On land that is not developed, the expansion of any sidewalk, boardwalk, path or trail that is related to a building or other structure, provided that the total footprint of all expansions of that physical work is no more than 100 m2
(3) On land that is not developed, the decommissioning, removal or replacement of any sidewalk, boardwalk, path or trail that has a footprint of no more than 100 m2
29 The modification of any sidewalk, boardwalk, path or trail
PART 7Structures in or Near Water
30 The modification or removal of any marine navigation aid structure or structure used for berthing or mooring that has a footprint of no more than 1000 m2 but not including any project that involves
(a) the placement of temporary or permanent fill in a water body;
(b) the disturbance of known or suspected subsurface contamination, unless the project is located within a site that is classified as closed in the Federal Contaminated Sites Inventory but not including sites closed that require risk management measures;
(c) the use of vehicles or heavy machinery on the substrate of a water body; or
(d) the use of explosives